NexGen Energy expanded the high-grade subdomain at its Patterson Corridor East (PCE) project following the 2026 summer drilling program.
The vertical extent of the high-grade zone increased by 17% to 644 meters. One drill hole intersected strong mineralization at a depth of 930 meters.
NexGen added a fifth drill rig to the program to further advance the discovery. Results indicate strong internal continuity of intense, high-grade mineralization.
The Saskatchewan Research Council Geoanalytical Laboratory is currently analyzing samples from the 2026 drilling. Full results are pending.